MARMARA EREGLISI TPP

GAMA ENRON JV
MARMARA EREĞLİSİ, TEKİRDAĞ, TURKEY
Our Company contracted this project which was worth US$1.200.000 and was the first power plant in line with the intematjonal environmental norms tand built with foreign capital in Turkey.This job realized in Marmara Ereğlisi, involved the coating of roof the main power plant building in the Thermal Power Plant of 478 megawatts, built by Gama - Enron - Stone & Webster, with imported liner tray sheet coating with perforated dye and clamped dyed sheet, the implementation of the detailed «rorkmanship of the türbine building över 14 pre-engineered buildings after their steel production, the coating of imported trapeze sheet coating över the same system on their façades, the production and mountjng of all gutters and conductors with the same type of sheet. All of the materials have been procured from the Netherlands, Germany, UK and Italy, in line with the standards.