Çayırhan TPP

Steel insulation and cladding works of the two turbines and machinery room of the power plant in Cayirhan, Ankara at elevation of 88 m with aluminum polyurethane trapezoidal panels and single side aluminum trapezoidal panels. Total cladding area was 68.000 sqm. In addition cladding of the 4.5 km conveyor line with galvanized steel sheets and glass reinforced polyester panels total cladding area of which was 47.900 sqm.

Completion Date : 1999

Project Details

Çayırhan TPP